Cerment plant Tuban, Indonesia
Planning period

2012-2013

Year of constrution

2012-2014

Services provided by Kottmann GmbH
  • Structural steel and concrete design (LPH 1-5)
  • earthquake dimensioning
Scope of design
  • Raw mill building
  • Dedusting and compound system
  • Preheater tower
  • Kiln piers
  • Clinker cooler building
  • Coal mill building
  • Cement mill building
  • including all dedusting and transport support structures

Directly on the coast in the east of the island of Java, Holcim Lafarge built a new cement plant with 2 production lines and its own pier. Kottmann GmbH was commissioned with the design of the process structures of the kiln line and the grinding plants in steel and reinforced concrete structure. The foundation of some structures was carried out by large-diameter concrete drilled piles.
The challenge was the very high seismic acitivities that had to be taken into account for the calculation. For this, we developed a project-specific design guideline in cooperation with a building dynamics specialist.
We provided the peer review for the large-capacity silos.