Cement plant Schelklingen, Germany
Planning period

2016-2017

Year of constrution

2016-2018

Services provided by Kottmann GmbH
  • Structural steel design
  • Workshop design
Scope of design

Complete steel construction for new kiln line incl.

  • Cooling tower support
  • Preheater tower (140m height)
  • Catwalks at kiln
  • Cooler building
  • Supporting structures for dedusting, pipe systems and RDF

In the course of the modernization of the cement plant in Schelklingen of HeidelbergCement AG, Kottmann GmbH received the order for the complete steel construction planning for the new kiln line.

All the work was carried out during ongoing plant operation adjacent to the existing kiln. The execution and workshop planning of the steel structures had to take into account special intermediate assembly conditions for this.

The support concept of the preheater tower with 4 corner supports specified by the plant design required exceptionally large beam heights and special measures in the shop detailing with regard to possible zinc bath sizes for the hot-dip galvanized finish.
The design was carried out for execution class EXC3 of DIN EN 1090-2.